A 1,240-acre pad-ready campus positioned against an existing 345kV corridor, engineered for phased hyperscale delivery.
Placeholder story. Westex assembled Mesa Verde across four family-held tracts over eighteen months, resolving fragmented mineral ownership and a legacy pipeline easement that had stalled two prior buyers.
The site sits within two miles of an existing 345kV corridor, which allowed a substation position to be reserved before the acquisition even closed. Grading began the following quarter, and the first 320-acre phase was delivered as a compacted caliche pad with perimeter road and construction power.
Non-potable water is sourced from a permitted brackish well field on the southern boundary, sized for closed-loop cooling at full buildout.
Site data
- Total acreage
- 1,240 acres
- Power
- 345kV adjacent · 500 MW reserved
- Water
- Brackish well field, 1.2 MGD permitted
- Fiber
- Two diverse long-haul routes
- Zoning
- Unincorporated, no zoning overlay
- Delivery
- Phase I pad-ready
Location
Ward County, West Texas
Placeholder site map. Full survey, title commitment, interconnect study, and geotechnical reports are available under NDA.